More
- Preamp, Processor or Receiver
- StormAudio ISP Elite 24 MK3 Processor
- Main Amp
- McIntosh MC1.25KW Monoblock Amps
- Additional Amp
- StormAudio PA 16 MK3
- Computer Audio
- ROON Nucleus One
- Universal / Blu-ray / CD Player
- Panasonic UB9000 4K UHD Player (for media discs)
- Front Speakers
- RTJ 410
- Front Wide Speakers
- JTR Neosis 110HT
- Center Channel Speaker
- MartinLogan Focus C-18
- Surround Speakers
- JTR Neosis 210RT
- Surround Back Speakers
- JTR Neosis 210RT
- Middle Height Speakers
- JTR Neosis 110HT-SL
- Front Height Speakers
- JTR Neosis 110HT-SL
- Subwoofers
- JTR Captivators - 4000ULF-TL x2 + 2400 x6
- Rear Height Speakers
- JTR Neosis 110HT-SL
- Other Speakers or Equipment
- VTI Amp Stands for the Monoblocks
- Video Display Device
- Sony 98X90L
- Remote Control
- AVA Cinema
- Streaming Equipment
- Kaleidescape | Lenovo X1 Carbon
- Streaming Subscriptions
-
Lifetime Roon Subscription
Tidal
qobuz
Netflix
Amazon Prime
- Satellite System
- Dish Joey 4K
- Other Equipment
- Zero Surge 8R15W-1 | Salamander Synergy Equipment Stand
- Headphones/IEMs
- HIFIMAN HE1000se / Unique Melody Mest MKII
- Headphone DAC/Amp
- WiiM Ultra / Topping DX9 / RME ADI-2 DAC FS / HIFIMAN Goldenwave Serenade
I got the Sony 98" on order with Robert at Value Electronics, and in the meantime, I need a stand for it. I got it cut and assembled today. The top is removable until I get the bottom part in the room and secured to the wall. I assembled and got the edge banding ironed on, ready for priming tomorrow, and probably the first coat of black paint. The second shelf is for the MartinLogan center channel speaker... it was not easy bending that plywood.
The entire unit will be mounted behind my center audio stand and amps, just below the current screen (which will be framed up and blocked off with canvas-painted Munsell N5 gray. The bottom shelf is removable, but there to help keep the wiring tidy and hold the switch and Intel NUC server.
The entire unit will be mounted behind my center audio stand and amps, just below the current screen (which will be framed up and blocked off with canvas-painted Munsell N5 gray. The bottom shelf is removable, but there to help keep the wiring tidy and hold the switch and Intel NUC server.
Last edited: